COLOCATION DELIVERY MODELS

Choose How Much We Build.

Deploy on the same RWS infrastructure with the level of facility support that fits your team. Start with powered land, add critical facility systems, or choose a fully integrated environment ready for your GPU hardware.

Every responsibility is defined before deployment, giving both teams a clear scope from site preparation through production handoff.

Find Your Starting Point

How much infrastructure should RWS provide?

Explore Bare Shell
Scope and Demarcation

Know Who Provides Every System.

Infrastructure projects slow down when responsibilities are unclear. RWS defines the delivery boundary before work begins, including who provides, installs, tests, commissions, and operates each system.

SystemBare ShellPowered ShellPowered Shell+Turnkey Modular
Building shell and structureRWSRWSRWSRWS
Utility power and site distributionRWSRWSRWSRWS
Fiber and meet-me-room accessRWSRWSRWSRWS
Conditioned white spaceCustomerRWSRWSRWS
Backup generation and fuel systemsCustomerCustomerRWSRWS
Central cooling plant and capacityCustomerCustomerRWSRWS
UPS, PDUs, and rack-level powerCustomerCustomerRWSRWS
Racks, CDUs, network, and commissioningCustomerCustomerCustomerRWS
GPUs, servers, and workloadsCustomerCustomerCustomerCustomer

Qualification noteThe table describes the standard delivery boundary. Final scope, system ownership, performance requirements, and acceptance criteria are established for each project during engineering and contracting.

Technical Qualification

What We’ll Validate Together

The delivery models define the standard responsibility boundaries. Your hardware, site, density, cooling, network, and schedule determine the final deployment scope.

Hardware Plan

What are you deploying?

We’ll review your GPU or server platform, rack count, equipment specifications, procurement status, and workload requirements.

Power and Cooling

What does the environment require?

We’ll validate total IT load, rack density, electrical interfaces, resiliency requirements, heat load, and cooling approach.

Site and Network

Where should it run?

We’ll match the deployment to available site capacity, fiber and carrier options, latency requirements, logistics, and regional expansion plans.

Schedule and Scope

When does it need to be operational?

We’ll establish the delivery model, responsibility boundaries, engineering requirements, commissioning plan, target schedule, and acceptance criteria.

Plan Your Deployment

Ready to Define the Deployment?

Bring us your infrastructure requirements. We’ll help identify the right site, delivery model, responsibilities, and path to production.