TURNKEY MODULAR AI INFRASTRUCTURE

From Power-Ready Site to First Token.

RWS coordinates the facility environment required for your GPU deployment—from site, power, and fiber through modular infrastructure, cooling, integration, testing, and commissioning. You bring the compute systems and workloads.

What Turnkey Modular Includes

The Facility Environment, Delivered as One System.

Turnkey Modular brings the major facility workstreams into one coordinated delivery scope. RWS aligns the site, utility power, fiber, modular data hall, cooling, rack infrastructure, integration, and commissioning around the requirements of your deployment.

With fewer handoffs between independent vendors, schedule dependencies and acceptance requirements can be defined before work begins.

01/

Site and utilities

Site qualification, utility coordination, power distribution, and backup generation.

02/

Modular facility

Modular data-hall systems and the supporting physical infrastructure.

03/

Cooling

Central plant, distribution, and rack-level cooling matched to the deployment.

04/

Power train

UPS systems, PDUs, rack-level power, and associated distribution.

05/

Connectivity and integration

Fiber, meet-me-room access, cross-connects, racks, CDUs, and agreed facility-network integration.

06/

Testing and commissioning

System verification, documented acceptance testing, commissioning, and production handoff.

Responsibility Boundary

RWS Delivers the Environment. You Bring the Compute.

Turnkey Modular gives the project one coordinated facility-delivery scope without taking control of the customer's compute architecture or workloads. Final responsibilities, interfaces, and acceptance criteria are documented during engineering.

RWS coordinates

  • Site qualification and delivery planning
  • Utility power and site distribution
  • Backup generation and fuel systems
  • Fiber and meet-me-room infrastructure
  • Modular data-hall infrastructure
  • Central and rack-level cooling infrastructure
  • UPS systems, PDUs, racks, and CDUs
  • Agreed cross-connect and facility-network integration
  • Installation coordination and system testing
  • Commissioning, acceptance documentation, and production handoff

Customer provides

  • GPUs, servers, storage, and related compute hardware
  • Compute architecture and hardware specifications
  • Network architecture, security policy, and workload configuration
  • Software, orchestration, models, data, and applications
  • Hardware procurement decisions and vendor approvals
  • Workload validation and production acceptance

Qualification note: This is the standard delivery boundary. Final system ownership, operating responsibilities, performance requirements, and acceptance criteria are established for each project during engineering and contracting.

Parallel Delivery Model

Factory and Site Work Move Forward Together.

Turnkey Modular is designed to advance workstreams in parallel. While site power, civil work, and fiber are prepared, modular facility systems can be engineered and assembled off-site. The workstreams converge for installation, integration, and commissioning.

01/

Factory work

Modular systems are engineered, assembled, and prepared around the approved deployment requirements.

02/

Site work

Power, civil, fiber, backup systems, and site infrastructure advance against the same deployment plan.

03/

Integration and commissioning

The facility systems are installed, integrated, tested, and accepted as one operating environment.

Qualification note: Schedule depends on utility availability, permitting, site conditions, equipment lead times, customer hardware readiness, and final project scope.

Path to First Token

A Defined Path to First Token.

RWS connects facility planning, delivery, and acceptance through a defined project path. Each stage establishes the inputs required for the next and makes key dependencies visible earlier.

01/

Qualify

Confirm site, power, fiber, cooling, deployment schedule, hardware plan, and operating requirements.

02/

Engineer

Define the facility design, responsibility boundary, system interfaces, performance requirements, and acceptance criteria.

03/

Build in parallel

Advance site infrastructure and modular-system work against the coordinated project plan.

04/

Integrate and commission

Install and test the facility systems, document results, and resolve acceptance items.

05/

Handoff and validate

Complete the agreed production handoff so the customer can deploy its compute and validate the workload.

What “first token” means: The facility environment and agreed integration scope have been commissioned and are ready to support customer hardware deployment and workload validation. Customer compute, software, and workload readiness remain customer responsibilities unless expressly included in the project scope.

Design Around the Deployment

Design the Environment Around the Actual Deployment.

Turnkey Modular is not a generic shell with infrastructure added later. The environment is qualified and engineered around the deployment's power, density, cooling, network, physical, operating, and acceptance requirements.

Power

IT load, redundancy, distribution, rack power, and expansion requirements.

Cooling

Heat-rejection strategy, supply temperatures, flow, rack density, and CDU requirements.

Network

Carrier access, cross-connects, pathways, demarcation, and agreed facility integration.

Physical environment

Rack layout, loading, clearances, access, security, and serviceability.

Operations

Monitoring, maintenance, escalation, access, and handoff responsibilities.

Commissioning

Test procedures, documentation, acceptance thresholds, and exception resolution.

Site Qualification

Power Is Only the Starting Point.

Available power does not automatically make a site deployment-ready. RWS evaluates the broader conditions that affect feasibility, design, schedule, operation, and future expansion.

Qualification areas

  • Utility capacity, delivery conditions, and schedule
  • Fiber availability, diversity, and carrier access
  • Civil, permitting, and physical site conditions
  • Cooling-system requirements and heat-rejection constraints
  • Backup generation and fuel strategy
  • Security, access, serviceability, and operating requirements
  • Expansion capacity and phased-growth options
Commissioning and Acceptance

Verify the Environment Before You Commit Capacity.

Acceptance should not be defined after installation. RWS establishes the required tests, documentation, performance thresholds, and responsibility for resolving exceptions during engineering—then validates the delivered environment against that agreed basis.

Review areas

  • Power-system operation and redundancy behavior
  • Cooling capacity, distribution, and control performance
  • Network pathways and agreed facility integration
  • Monitoring, alarming, and operational visibility
  • Failure-response and recovery procedures
  • Documentation, open-item resolution, and production handoff

Review the proposed site, infrastructure scope, system interfaces, and acceptance approach with the RWS engineering team.

Frequently Asked Questions

Turnkey Modular FAQs

What does “turnkey” mean at RWS?

RWS coordinates the infrastructure environment surrounding the customer’s compute systems, including the site, power, fiber, modular data hall, cooling, racks, integration, testing, and commissioning. Final scope is defined for each project.

Does RWS provide the GPU hardware?

The standard turnkey model assumes the customer supplies its GPU systems and workloads. RWS may help coordinate procurement partners or provide bridge capacity when appropriate, subject to availability and separate commercial terms.

Which sites support turnkey modular deployments?

Site eligibility depends on current capacity, power, fiber, cooling, development status, deployment size, and schedule. RWS confirms supported sites during qualification.

How quickly can a turnkey environment be deployed?

Timing depends on project scope, site readiness, engineering, utility conditions, equipment availability, customer hardware, and contract terms. RWS provides a project-specific schedule after qualification.

Can RWS support liquid-cooled hardware?

RWS evaluates liquid-cooling requirements as part of site and design qualification. Supported configurations and available capacity vary by site.

Can we begin with one delivery model and expand the RWS scope later?

Potential changes depend on the site, project stage, installed systems, commercial terms, and engineering requirements. The preferred future-state model should be discussed during initial planning.

Can RWS provide temporary compute while our environment is being completed?

RWS-hosted GPU or bare-metal capacity may be available for development, migration, or bridge workloads. Availability, hardware, performance, and pricing are confirmed separately.

Plan the Deployment

Bring Us the Hardware Plan and Production Target.

Share your location, power, density, cooling, hardware, and schedule requirements. RWS will help qualify the appropriate site and define a coordinated path from facility delivery through production handoff.