Total Power
10 MW
Request a McAllen site tour to review low-latency South Texas deployment options and the next steps for technical validation.
90 to 120-day lead time ARO for custom colocation build-outs.
Sites are ready to populate with lite & dark fiber available immediately.
Fully equipped to host the complete NVIDIA portfolio, including A100, H100, H200, B200, B300, and GB300 systems.
Built on highly efficient 120 kW modules that are fully stackable. Our architecture is designed to seamlessly handle hyperscale rollouts of 50 to 200 containers per site.
Each container module is adaptable and equipped to support both air and water cooling configurations.
McAllen's South Texas position supports latency-sensitive services, hybrid delivery models, and regional resiliency for traffic that needs to stay close to the edge.
McAllen combines low-latency regional reach, hybrid-friendly traffic patterns, and modular infrastructure built for responsive GPU and edge deployments.
10 MW
6,000
5,500
5,000