Total Power
6 MW
Review the primary Northwest campus and coordinate site access, technical validation, and rollout planning with the RWS team.
90 to 120-day lead time ARO for custom colocation build-outs.
Sites are ready to populate with lite & dark fiber available immediately.
Fully equipped to host the complete NVIDIA portfolio, including A100, H100, H200, B200, B300, and GB300 systems.
Built on highly efficient 120 kW modules that are fully stackable. Our architecture is designed to seamlessly handle hyperscale rollouts of 50 to 200 containers per site.
Each container module is adaptable and equipped to support both air and water cooling configurations.
West Wenatchee creates a reliable Washington deployment base for Pacific Northwest workloads, regional access, and dense GPU infrastructure planning.
West Wenatchee combines primary Pacific Northwest placement with modular AI capacity and infrastructure designed for scalable workloads and fast regional access.
6 MW
3,600
3,300
3,000