Total Power
13 MW
Request a George West site tour to walk through routing resilience, technical validation, and deployment planning.
90 to 120-day lead time ARO for custom colocation build-outs.
Sites are ready to populate with lite & dark fiber available immediately.
Fully equipped to host the complete NVIDIA portfolio, including A100, H100, H200, B200, B300, and GB300 systems.
Built on highly efficient 120 kW modules that are fully stackable. Our architecture is designed to seamlessly handle hyperscale rollouts of 50 to 200 containers per site.
Each container module is adaptable and equipped to support both air and water cooling configurations.
George West balances traffic between coastal and inland routes, making it a strong fit for resilient, storage-heavy, and always-on infrastructure deployments.
George West combines resilient South Texas positioning, multi-path regional routing, and modular infrastructure designed for dependable long-running GPU workloads.
13 MW
7,800
7,150
6,500