Total Power
5 MW
Review the redundant Wenatchee pairing site and coordinate tour access, technical validation, and deployment planning.
90 to 120-day lead time ARO for custom colocation build-outs.
East Wenatchee is positioned for rapid turn-up with fiber available, making it a straightforward pairing site for redundant Wenatchee deployments.
Fully equipped to host the complete NVIDIA portfolio, including A100, H100, H200, B200, B300, and GB300 systems.
Built on highly efficient 120 kW modules that are fully stackable. Our architecture is designed to seamlessly handle hyperscale rollouts of 50 to 200 containers per site.
Each container module is adaptable and equipped to support both air and water cooling configurations.
East Wenatchee extends the Wenatchee Valley footprint with a companion site built for redundant pairing, low-latency regional access, and failover planning.
East Wenatchee combines paired redundancy, flexible Wenatchee Valley capacity, and infrastructure positioned for failover-ready GPU deployments.
5 MW
3,000
2,750
2,500